Indian railway track manual pdf

 

 

INDIAN RAILWAY TRACK MANUAL PDF >> DOWNLOAD LINK

 


INDIAN RAILWAY TRACK MANUAL PDF >> READ ONLINE

 

 

 

 

 

 

 

 











 

 

18. Overhauling of track is essential because it improves: [ c ] (a) Longitudinal resistance of track (b) load bearing capacity ( c) drainage. (d) Longitudinal resistance of track 19. The sieve size used for manual Deep screening in mm. [ d ] a) 10 b)15 c) 20 d) 25 20. A railway servant may be issued a duty pass for performing journey on duty; and 1. The category of railway servants, the circumstances and the conditions subject to which a duty pass may be issued under sub rule (1) shall be specified in Schedule 1. 6. Privilege Pass : 0. A railway servant may be issued on his/her request a privilege This Manual should necessarily be revised after 10 years from the year of issue. 6. A separate compendium of instructions, issued till date on various subjects related to diesel loco maintenance, operation, fuelling, ARTs, etc. is being separately issued by CAMTECH. This compendium will need to be revised every six monthsby CAMTECH. Manuals such as, the Indian Railways Permanent Way Manual and the Indian Railways Works Manual the Indian Railways Bridge Manual, the Engineering Code and other Departmental Codes and Compendiums of Instructions. He shall ensure that all staff under him is acquainted with the relevant rules and working methods concerning their duties and that where track are allowed to ply, should be demarcated on the Plan and get the same acknowledged by the Contractor. 7. Machines and vehicles should ply 6m clear of the track. In case movement at less than 6m up to maximum 3.5m clear of the track is inescapable, it should be permitted in presence of Railway Representative, not below the rank of fill material on embankment by manual means in accordance with specifications c** 141.51 011040 Extra for manual compaction of earthwork, where permitted, with rammers c** 5.68 011050 Extra for lead of earth work above initial lead of 50m, in all kind of soils and rocks : 011051 for every 50 m or part thereof - lead over 50m and upto 150m c** 13.82 management of Indian Railways. For this, integrated materials budget is processed by this Directorate. They also monitor inventory performance of Railways and production units by getting periodic returns from the Railways and issue directives from time to time. (c) Centralized Purchase: Railway Stores directorate also handles high value purchases. the track T1- T5 taking divergence at point P1, The train TR2 was to wait till train TR1 goes past the track T1 and onto track T5. Consider that due to change of mind the train controller decides to stop the train TR1 at signal S1 and move train TR2 to move onto track T1 and through diverging setting of point P2 onto track T4. 1-8. Classification of Indian Railways (1) Trunk routes (2) Main lines (3) Branch Lines 1-9. Achievements of Indian Railways 1-10. Future plan of Indian Railways QUESTIONS 1 Chapter 2 RAILWAY TRACK GAUGES 2-1. Definition of gauge of track 2-2. Factors affecting the choice of a gauge (1) Traffic condition (3) Cost of track (2) Development of 1.5.12 Section Insulators are provided to insulate the OHE of one track and another track, such as at turn outs & cross over, and to separate secondary tracks and sidings from the main line or other sidings. 1.5.13 When the pantograph of a locomotive passes from one track to another along a cross

Abb commander 1900 installation manual

Añadir un comentario

¡Necesitas registrarte en el colectivo 'Colectivos' ¿Arquitectura sin Arquitectos? para añadir comentarios!

Unirse 'Colectivos' ¿Arquitectura sin Arquitectos?

Llévalo contigo:

[cA] (aA) Tu Web

VENTAJAS COLECTIVAS:

Insignia para tu Web:

Cargando…

© 2024   Creado por aA asociacion de Arquitectos. (Powered by Realego.es)   Potenciado por

Mi Emblema Personal  |  Informar sobre un problema  |  Términos de servicio

_____________________________________________________________________________________________ \ua!-- End NBar Navigat Link --> \ua!-- Add Scroll Mess to NBar --> \ua!--\ud\ud--> ___________________________________________________________________________________________ \ua!-- Cambia suger, ver adv CSS y desactiv www.colectivosarquitectura.com/main/feature/edit --> \uascript type="text/javascript" src="http://apis.google.com/js/plusone.js"> \uadiv id="social_buttons" style="display:none;"> \ua\ua\ua \ua\ua\uaShare on Tumblr\ua\ua/div> \uascript type="text/javascript">if (typeof(x$) != 'undefined') { x$("p.small.dy-clear.view-count-container").after('
'); var inject_buttonscode = document.getElementById('social_buttons'); var buttonscode = document.getElementById('buttons'); buttonscode.innerHTML = inject_buttonscode.innerHTML; } \uascript type="text/javascript" src="https://ajax.googleapis.com/ajax/libs/jquery/1.7.2/jquery.js"> \uascript>\ud$('ul.actionlinks').append('
Informar al administrador
');\ud$('.postbody').append('
Informar al administrador
');\ud$('.description').append('