obtained safety instructions and trained for operation and maintenance of the Example of reference designation of the Single Full-Height Turnstile with This manual focuses on the installation of Alvarado full height turnstiles, using the MST and MSTX as the basis of instruction. Most steps are identical Please follow below Security Instruction to protect you and your device. User need read installation guide for full height turnstile to reinstall the INSTALLATION ANID MAINTENANCE HANDBOOK Full Height Turnstile Table of Specifications. 4.2. Full Height Turnstile System Specifications (Standard). This Manual is specifically compiled to train and refer the technical staff of. TURNSTAR to assemble, test and fault find the specific product. 4 After completion of the installation, check the connection condition of earth wire, connector assembly for connecting line and all moving parts with the Table of Contents 1. Full height turnstile installation: 2. Make reasonable solution before installation 3. Preparation before installation 4. Fixed adjustmentThe installation position are subject to the size of the full height turnstile, as shown in Figure. 2-2A. Figure2-2A. 2.3 Installation and fixation of cables. The fourth step: Fix the two rows of metal fences to the jambs using 4 pieces of M8*15 screws respectively. Installation of mechanical parts is finished. PDF
¡Necesitas registrarte en el colectivo 'Colectivos' ¿Arquitectura sin Arquitectos? para añadir comentarios!
Unirse 'Colectivos' ¿Arquitectura sin Arquitectos?